ALPHA ENGINEERING & DESIGN (2012) LTD.
  • HOME
  • ABOUT US
    • History
    • Core Values
    • Memberships & Awards
  • SERVICES
  • PROJECTS
    • Local Projects
    • Regional Projects
    • Community Service
  • MEET THE TEAM
    • Directors
    • Staff
  • CONTACT US
  • EMPLOYMENT OPPORTUNITIES

Caparo River Basin

Picture
CLIENT:
Drainage Division
Trinidad

LOCATION:
Caparo, Trinidad

START  DATE:
May 1995

 COMPLETION  DATE:
October 1995
Alpha worked as part of a multi-disciplinary team for the completion of a final design report for the Caparo river basin water resources and flood abatement project  for the  Ministry of Works and Transport, Drainage Division.  

The scope included:
  • Hydrological analysis of the Caparo river basin.
  • Preliminary and detailed designs and calculations.
  • Preparation of a land management strategy and landuse plan to control the hydrological regime.
  • Recommendations for improved flood control and ancillary works. 
  • Development of preliminary designs for dams in the upstream catchment to functions as detention areas.
  • Main river re-alignment.
  • Bifurcation of the overflow to the Honda river including back water profiles.
  • Overflow weir design at the Honda confluence.
Picture
  • HOME
  • ABOUT US
    • History
    • Core Values
    • Memberships & Awards
  • SERVICES
  • PROJECTS
    • Local Projects
    • Regional Projects
    • Community Service
  • MEET THE TEAM
    • Directors
    • Staff
  • CONTACT US
  • EMPLOYMENT OPPORTUNITIES