Agostini Wastewater Treatment Plant
|
CLIENT:
Agostini Marketing San Juan, El Socorro Extension LOCATION: El Socorro, Trinidad START DATE February 2016 COMPLETION DATE Ongoing |
Alpha has been contracted by Agostini Marketing to provide Consultancy Services for the refurbishment of the compounds existing wastewater treatment system, consisting of four (4) lift stations and a solid and activated sludge sequential batch reactor.
The major aspects of the project include:
The major aspects of the project include:
- Literature review of existing design reports and O&M manuals.
- Site assessment and detailed inspection of all components of the existing collection sub-system (septic tanks, sumps with pumps); and the WWTP.
- Preparation and submission of an assessment report including recommendations on refurbishment; as well as preliminary cost estimates and schedule for works.
- Wastewater collection and treatment system overview