Alpha acted as Project Manager on this phased 95-ha infrastructure development for Total Holdings Limited.
The scope of works included: Procuring all agency preliminary and final approvals for the project including; T&CPD, WASA, T&TEC, TSTT and Fire. Stage 1: Surveys and planning Development of planning and design criteria and standards. Stage 2: Outline Layout Design Analysis of development potentials and constraints, environmental issues, schematic layouts and design, preliminary construction cost estimates. Stage 3: Preparation of Preliminary Designs Structure plans with development schemes, land use allocations, road/utility axes. Stage 4: Detailed Designs and Preparation of Contract Documents Detailed designs and layouts; water and sewerage reticulation systems; road and drainage networks; lotification; conditions of contract in accordance with FIDIC standards. |